Completed Jobs
Trans-bay Pipeline*
*World Record for longest plastic pipe slipline
Entry Side
Exit Side
Owner: Cargill Salt (Galindo Construction - General Contractor)
Crossing: South San Francisco Bay (Parallel to Dumbarton Bridge)
Length: 6,984 total LF
Pipe Size: 14" Fusible PVC (Slipline in existing 20" steel pipe)
Compl. Date: March 2012
Location: Newark, CA
_________________________________________
Reclaimed Water Outfall for Housing Expansion
Owner: City of Tiburon (Team Ghilotti – General Contractor)
Crossing: Reclaimed water outfall exiting on bottom of S.F. Bay
Length: 500 LF (solid rock formation)
Pipe size: 6" HDPE (reclaimed water outfall)
Compl. Date: October 2008
Location: Tiburon, CA
______________________________________
Replacement of Existing Sewer Line Using Pipe Reaming
Owner: City of Modesto (C.T.I. - General Contractor)
Crossing: Pipe Reaming (Ream through 24" RCP)
Length: 9,000 total LF at various lengths (700 LF - 1,000 LF)
Pipe Size: 18", 24", 30" (HDPE)
Compl. Date: December 2006
Location: Modesto, CA
For a list of notable projects completed click on the link below:
J-C General Engineering Completed Projects
Owner: Niska (Rockford Corp. - General Contractor)
Crossing: Canals, Wetlands, and Roads surrounding Wild Goose Gas Storage
Length: 4 crossings at 750 LF, 850 LF, 1,000 LF, 1,100 LF (soil formation)
Pipe Size: 24" Steel (High pressure gas main)
Compl. Date: September 2009
Location: Gridley, CA
Brentwood Bypass Widening
Owner: Venoco (Rockford Corp. – General Contractor)
Crossing: 60 VF elevation change at 2,500 FT Radius
Length: 1,860 LF (rock formation)
Pipe size: 12" steel (High-pressure gas main)
Compl. Date: November 2009
Location: Brentwood, CA
______________________________________
Chevron Gas LineOwner: Chevron (Rockford Corp.- General Contractor)
Crossing: 304 VF elevation change
Length: 1,800 LF (rock formation)
Pipe size: 8" steel (jet fuel line)
Compl. Date: October 2007
Location: Livermore, CA
______________________________________
Deep Water Channel Bore
Owner: ABA Energy (A&A Production - General Contractor)
Crossing: San Joaquin Ship Channel (Roberts Is. to Rindge Tract.)
Length: 2,300 LF (soil formation)
Pipe size: 6" steel (natural gas)
Compl. Date: November 2005
Location: Stockton, CA
Copyright 2010 J-C General Engineering, Inc.. All rights reserved.
J-C General Engineering, Inc.
1102 Black Diamond Way
Lodi, CA 95240
United States
ph: (209) 333-5295
fax: (209) 333-5299
wedrilli